The following list of capital projects are expected to take place this year for the Public Works Roads Department.
Duffy's Road Reconstruction |
Scope of Work: pulverize existing surface, enhance subgrade, replacement of culvert, ditching, and double surface treatment. Time Frame: Construction will be ongoing from April 19 to August 31. |
Myers Road Reconstruction |
Scope of Work: Pulverizing, enahancement of subgrade, replacement of culvert, ditching, and asphalt. Time Frame: Construction will be ongoing from April 19 to August 31 |
Ingleside Water Tower Rehabilitation |
Scope of Work: Exterior tank painting, spot welding repairs, interior tank coating and addition of corrosion protection system. *Please note: Ingleside water tower will be offline for a period of time during the construction period. This interruption will NOT affect operation of the water system. Residents may note intermittent changes in water pressure, these will be temporary and short in duration. Time Frame: April 12 - June 30 |
Savings Street Drainage Improvement |
Scope of Work: Ditching, installation of subdrain, replacement of culverts in preparation for future reconstruction. Time Frame: Construction will be ongoing from June to September |
St. Andrews Sidewalk Reconstruction |
Scope of Work: Removal of existing sidewalk replacing with Concrete Curb and Asphalt Sidewalk. |